Ledesma Jr. said in a text message. Ledesma did not say what issues needed to be threshed out. The bidding for the power barges, each of which can generate 32 megawatts, will be conducted simultaneously with the bidding for the operation and maintenance contract for the 650-MW Malaya thermal power...
FULL ARTICLE AT Inquirer.net