If you're traveling to the airport and is on the dual carriageway to the airport must continue Girón later the toll to Lebrija and to return in the 63 km below the scale located on the corridor. You must then enter the exchanger and pass through the overpass to resume his usual route.Drivers who descend from Palonegro bound to Bucaramanga, must climb the bridge and turn right onto the national route. (See graph)According Highway Santander, which administers this broker dealer, traffic changes will be made to advance the rehabilitation of the road that will flow from Girona to the airport, so close the whole road in one extension of 300 meters. There he performed works of the existing pavement milling, shaping and implementing new road asphalt. According to the dealership traffic control will be available 24 hours a day to ensure the flow of traffic in the sector."Drivers are asked to respect the temporary signage installed, to comply with the instructions given by traffic controllers, to make return at the stated location and patience during the time step remains suspended.Similarly, it is recommended that users of the airport exit in time so as not to have complications with schedules of their flights and avoid further discomfort, "said the dealer in a statement.The works are part of the area defined as stage I of the project Bucaramanga Metropolitan Area, which will be between the airport and two heat exchangers Giron, including this close to the toll and one that will replace the one that existed in the area of the Town.The structure consists of a grade-separated interchange will be located in the T of the airport, a few meters below the toll, and will have two lanes and 35 meters of light.Once put into operation this exchange, the traffic heading from the airport and Girón Lebrija to take the bridge to enter the toll, while traffic is directed from Girona to Lebrija or airport take the national route as usual .
Or add related content to this report
News Stories | Blogs | Images | Videos | Comments